Case Study
Agile Manufacturing for a European Boutique Brand
Background
A German online boutique specializing in minimalist watches needed high-frequency, low-volume production.
The Challenge
Large factories often rejected smaller batches, while the client needed fast design-to-product turnaround.
The Solution
Jumbo’s agile 50-person team created a green production channel and used video consultations to optimize watch structure directly from sketches.
The Results
The launch cycle was shortened by 15 days, enabling the brand to stock successfully before the Christmas sales season.
项目背景
一家德国极简腕表在线精品店需要“多批次、小批量”的柔性生产支持。
项目挑战
传统大厂通常不愿承接小批量订单,而客户需要快速完成从设计到成品的转换。
解决方案
金宝表业利用 50 人灵活团队开辟绿色生产通道,并通过视频会议直接根据草图优化腕表结构。
项目成果
新品上市周期缩短 15 天,客户得以在圣诞销售旺季前顺利完成备货。